Tamreeny
The training program crafted for you برنامج تدريبك، مفصّل لك

Stop guessing.
Start getting stronger.

لا تعوّر راسك.
تمرينك صار أذكى

Exercises, weights, sets, and reps for every session, intelligently tailored to you.

التمرين والوزن والجولات والعدات محسوبة خصيصاً لك لتحقيق هدفك.

KD 1 for your first week · Full access · Cancel anytime لأول أسبوع · كل المميزات · الغي في أي وقت

The App التطبيق

A coach that knows you كابتن يعرفك ويتابعك

Built for you, it remembers every set you log and gets smarter every week. Real screens from inside the app.

Today's Session جلسة اليوم
Exact weights. Set types labeled. Warm-up included. Zero guessing. أوزان محددة. أنواع السيتات واضحة. إحماء مدرج. بدون تخمين.
Swap Any Exercise بدّل أي تمرين
Missing the equipment, or just not feeling a lift? Swap it. We give you the alternative that works the same muscle, at its own exact weight. مو متوفرة العدّة أو ما يعجبك تمرين؟ بدّله. نعطيك البديل اللي يفعّل نفس العضلة، وبوزنه المضبوط.
Progress Tracking تتبع التقدم
Strength charts, consistency scores, volume trends. Watch your numbers climb week over week. رسوم بيانية للقوة، نسبة الالتزام، اتجاهات الحجم. شوف أرقامك تطلع أسبوع بأسبوع.
Exercise Videos فيديوهات التمارين
Front and side angles for every movement. Tap any exercise to see correct form. زاويتين لكل حركة. اضغط أي تمرين وشوف الفورم الصحيح.
Log Every Set سجل كل سيت
Weight and reps for every set, with rest timers between them. Recover the right amount, then go again. الوزن والتكرارات لكل سيت، ومؤقت راحة بينها. ترتاح المدة الصح، وترجع تكمل.
Your Program برنامجك
Full explanation of why your program is structured this way. Transparency, not a black box. شرح كامل ليش برنامجك مبني بهذه الطريقة. شفافية، مو صندوق أسود.
Personalized Messages رسائل شخصية
Every message is built from how you actually train. Your everyday use, your patterns, your effort. Not generic motivation. كل رسالة مبنية على تمرينك الفعلي. استخدامك اليومي، عاداتك، ومجهودك. مو تحفيز عام.
Session History سجل جلساتك
Every session you finish is saved with its weights and reps, so nothing is forgotten. كل جلسة تخلصها محفوظة بأوزانها وتكراراتها، ما ينسى شي.
Process الخطوات

Up and training in 10 minutes تبدأ التمرين خلال ١٠ دقايق

Step 01الخطوة 1

Complete the consultation

5-8 minutes. This builds your program, not a template.

Step 02الخطوة 2

Get your program instantly

Exercises, sets, reps, and exact weights generated instantly.

Step 03الخطوة 3

Train and log every session

Log every set. From week 2, your logs drive the weights up, hold, or deload.

Step 04الخطوة 4

Watch your program evolve

Weights increase automatically. Volume cycles. Deloads when needed.

Pricing الأسعار

Simple pricing إشتركك يحقق اهدافك.

Join the waitlist, and your first week is just 1 KD. Then KD 10/month at launch (KD 13 after) or a 3-month plan. No contracts, cancel anytime.

Monthly شهري
KD 13.000
KD 10.000
per month بالشهر
  • Full access to all features كل المميزات متاحة
  • New personalized program every week برنامج مخصص يديد كل أسبوع
  • Exact weights, weekly progression أوزان محددة، تطور أسبوعي
  • Cancel anytime ألغ أي وقت
Join the waitlist سجل بقائمة الانتظار

Join the waitlist and enjoy your first week for 1 KD. سجل بقائمة الانتظار واستمتع بأول أسبوع بدينار واحد.

Full access to everything. No restrictions. كل المميزات متاحة لك. بدون قيود

What's Live Now شغال الحين

What you'll get اشتراكك يشمل

A one-of-a-kind set of features you won't find anywhere else.

Exercise Videos

Front and side angles for every movement. Gender-specific demonstrations. Tap any exercise to see correct form, no hunting for YouTube.

Exact Weights for Every Set

No "use a challenging weight." Every exercise has an exact kilogram target. Calibration week first, then automatic progression based on your actual performance.

Programs That Evolve Weekly

New program every week generated from what you actually did, not what was planned. Phases: muscle building, strength, volume peaks, recovery deloads.

Safe by Design

20+ automated safety checks on every program. Medical red flags trigger immediate referral. Hard gates, not suggestions.

Bilingual Coaching

Arabic or English, your choice, switch anytime. Not formal Arabic. The way you actually talk. Your coach speaks your language.

Exercise Swap

Don't like an exercise? Swap in 2 taps. Permanent or one-time. Alternatives target the same muscles with your available equipment.

FAQ أسئلة شائعة

Common questions أسئلة شائعة

A human trainer sees you for 1 hour, 3 times a week, at their schedule. Tamreeny is available 24/7, knows your exact weights from last session, adapts your program every single week based on your actual performance, and costs a fraction of the price.

An online personal coach in Kuwait typically costs KD 40 to 60+ per month, and in-gym sessions cost more. Tamreeny gives you a personalized program that adapts to your logged performance every week for KD 10 per month at launch, with your first week for 1 KD.

No. The consultation asks exactly what equipment you have, whether that's a full gym, a home setup with dumbbells, resistance bands, or just bodyweight. Your program uses only what you actually have.

Medical red flags (chest pain, dizziness, numbness) trigger an immediate session stop and a doctor referral, no exceptions. For exercise-specific pain, the exercise is automatically removed and replaced. Injuries are handled at 3 severity levels. You are never pushed through pain.

Yes. The KD 1 trial can be cancelled before your first week ends, no charge beyond the KD 1. Monthly subscriptions can be cancelled at any time. Longer plans are paid upfront at a discounted rate and you retain full access for the entire duration you paid for.

Ready? جاهز؟

Join the waitlist.
Enjoy your first week for 1 KD.
سجل بقائمة الانتظار.
واستمتع بأول أسبوع بدينار واحد.

When it's your turn, you get full access. Every feature. No restrictions. If it's not for you, we refund you. لما يجي دورك، تاخذ كل المميزات. بدون قيود. إذا ما عجبك، نرد لك فلوسك.

Join the waitlist سجل بقائمة الانتظار Already a member? Log in عندك حساب؟ سجل دخول
Join the waitlistسجل بقائمة الانتظار